More Controllable Schedules
Development, validation and site preparation are divided into reviewable milestones instead of accumulating near the delivery date.
PLC CONTROL DEVELOPMENT · INDUSTRIAL SOFTWARE
For industrial automation machine builders and OEM customers, Kelite provides PLC and motion-control development across Beckhoff, Siemens, Omron, Rockwell, Mitsubishi and CODESYS platforms, together with C#, Qt, data acquisition and on-site commissioning. Projects cover logistics, 3C manufacturing, packaging, automotive equipment and other industrial applications, with flexible machine, module and project-stage support for global delivery.
Remote development · On-site commissioning · Global project delivery
AUTOMATION ENGINEERING SERVICES
For machine builders and OEM customers, Kelite delivers PLC, motion control, C# / Qt applications, industrial data and on-site commissioning as a complete machine scope, functional module or project phase.
View service scope
01
02
03
04
PROJECT DELIVERY VALUE
Clear scope, parallel development and phased validation help organise engineering work, identify interface risks earlier and reduce late-stage rework.
Development, validation and site preparation are divided into reviewable milestones instead of accumulating near the delivery date.
Service scope can follow the machine, functional module or project stage, reducing duplicated development, platform trial-and-error and late rework.
Control platforms, motion concepts, communications and data interfaces are reviewed before field integration.
Agreed backups, parameters, issue records and maintenance information support acceptance and future service.
PROJECT DELIVERY MAP
The scope follows actual project conditions, and phases can run in parallel according to the machine plan and site readiness.
PROJECT EXPERIENCE
All published cases are authorised and sanitised, focusing on the machine type, control platform, work scope and delivered outcome without disclosing customer identities or confidential information.
AI Scene Illustration
Delivered ResultStable production operation
↗
AI Scene Illustration
Delivered ResultStable production operation
↗
AI Scene Illustration
Delivered ResultStable production operation
↗
AI Scene Illustration
Delivered ResultStable production operation
↗SERVICE PROCESS
Technical objectives, interfaces, implementation scope and deliverables are agreed before work begins, with reviewable outcomes at each stage.
Review the machine process, control platform, available documents and project schedule.
Stage OutputRequirements List
Define the system architecture, interfaces, schedule, risks and delivery scope.
Stage OutputTechnical Proposal
Develop and verify PLC, motion, HMI or supervisory software in controlled stages.
Stage OutputSoftware Build
Coordinate machine commissioning, cycle optimisation and abnormal-condition validation.
Stage OutputTest Records
Provide agreed backups, technical documentation, user training and follow-up support.
Stage OutputHandover Package
TECHNOLOGY STACK
The technical route follows each customer’s standards and project conditions, without forcing a single brand.
Beckhoff / TwinCAT · Siemens · Mitsubishi · Omron · Rockwell · CODESYS
Servo · Motion · EtherCAT · Profinet · Modbus TCP · OPC UA
C# · .NET · Qt · HMI · Databases · Reporting · Traceability · APIs
ENGINEERING INSIGHTS
Structured project methods, engineering experience and technical guidance across PLCs, motion control, industrial software and machine commissioning.
AI Cover Illustration
The value of object-oriented programming in machine control is not the number of methods, properties or interfaces used. It is the ability to organise machine units, process logic,…
Read Article
AI Cover Illustration
Stable servo motion depends on the combined quality of the mechanical system, component sizing, control interface, safety circuit, parameter baseline and PLC state management. Commissioning should start with…
Read Article
AI Cover Illustration
A safety PLC and safety network are implementation tools, not a complete safety argument. A dependable machine-safety system requires a lifecycle covering risk assessment, safety requirements, architecture, software…
Read ArticleAUTOMATION SERVICE FAQ
Key points commonly confirmed before project implementation, including technical scope, assessment, delivery methods and handover.
Depending on project needs, Kelite provides PLC and motion-control development, HMI, C# and Qt industrial applications, communications and data interfaces, machine commissioning, software optimisation and follow-up technical support. The technical scope can be defined by complete machine, functional module or project phase.
Recommended inputs include the machine function, process flow, electrical drawings, I/O list, control platform, communication interfaces, cycle-time requirements and target milestones. An initial technical discussion can begin before every document is complete.
The assessment considers the work scope, control platform, functional complexity, number of interfaces, site conditions and delivery plan. Once requirements are confirmed, the technical scope, deliverables, estimated schedule and fee are clarified.
Yes. Remote development, online reviews, on-site commissioning and post-delivery technical support can be arranged according to the project stage, machine status, location and site conditions.
A confidentiality agreement can be signed when required, with controlled access to drawings, software and process information. Customer names, site photographs and project details are not published without authorisation.
According to the agreed scope, handover can include source files, project backups, parameter records, issue logs, operation or maintenance notes, essential training and follow-up technical support.
PROJECT CONSULTATION
Share the machine type, control platform, functional scope, current stage and target milestones. We will begin by reviewing technical feasibility, implementation scope, interface conditions and handover requirements.
An initial discussion can begin even if the project information is not yet complete.